DOI: 10.7763/IJCTE.2011.V3.318
Multi Criteria Job Shop Schedule Using Fuzzy Logic Control for Multiple Machines Multiple Jobs
Abstract—In the present scenario the modern engineering and industrial manufacturing units are facing lot of problems in many aspects such as machining time, raw material, manpower, electricity, and customer’s constraints. Such a complex problem of vagueness and uncertainty can be handled by the theory of fuzzy logic based in using a membership function to solve a fuzzy mix product selection. We use the amalgamation of fuzzy job shop scheduling approach to find profits and customer satisfaction using a fuzzy -JSP approach [1].
Index Terms—Job shop scheduling, Fuzzy Logic, Production Planning, Multi criteria.
R. Ramkumar is with the Department of Master of Computer Applications ,Maharaja Engineering College , Avinashi, Coimbatore Tamilnadu, India (e-mail: ramkumarpri@ gmail.com).
Dr. A. Tamilarasi is with the Department of Master of Computer Applications , Kongu Engineering College, Perundurai, Erode, Tamilnadu, India (e-mail: angamuthu_tamilarasi@yahoo.co.in).
Dr. T. Devi is with the Department of Computer Science and Engineering, bhrathiyar University, Coimbatore, Tamilnadu, India (e-mail: tdevi@yahoo.co.in).
Cite: R. Ramkumar, A. Tamilarasi, and T. Devi, "Multi Criteria Job Shop Schedule Using Fuzzy Logic Control for Multiple Machines Multiple Jobs," International Journal of Computer Theory and Engineering vol. 3, no. 2, pp. 282-286, 2011.